{"id":41810,"date":"2025-03-03T07:13:43","date_gmt":"2025-03-03T04:13:43","guid":{"rendered":"https:\/\/www.commercialcafe.com\/blog\/?p=41810"},"modified":"2025-03-25T14:40:12","modified_gmt":"2025-03-25T11:40:12","slug":"provident-begins-construction-of-phase-4-at-el-paso-industrial-park","status":"publish","type":"post","link":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/","title":{"rendered":"Provident Begins Construction of Phase 4 at El Paso Industrial Park"},"content":{"rendered":"<p>Dallas-based Provident Realty Advisors, through its division Provident Industrial, recently broke ground on phase four of Gateway Logistics Park in El Paso, Texas.<\/p>\n<p>The project is slated to add roughly 497,000 square feet of <a href=\"https:\/\/www.commercialcafe.com\/industrial\/us\/tx\/el-paso\/\" target=\"_blank\" rel=\"noopener\">El Paso industrial space<\/a> across three Class A, rear-load buildings. Reinforcing the park\u2019s position as a premier logistics hub in the region, this expansion adds to the approximately 922,000 square feet already delivered in the first three phases of development.<\/p>\n<p>Notably, phase four is ideally located for tenants operating in cross-border logistics and distribution: It\u2019s less than eight miles from the Ysleta-Zaragoza Port of Entry in Ju\u00e1rez, Mexico, and it also offers direct access to Loop 375.<\/p>\n<p>Buildings Four and Five will each incorporate 147,420 square feet and share a 205-foot truck court. Building Six will include a 130-foot truck court and 44 trailer parking stalls, as well as deliver more than 202,000 square feet of space.<\/p>\n<p>Completed in 2023 and 2024, buildings One, Two, and Three of the Gateway Logistics Park feature 7\u201d floor thickness; 32\u2019 to 36\u2019 clear heights; ESFR fire sprinkler systems; 54\u2019 by 50\u2019 column spacing; and four-phase, 277\/480 Volts, 4,000-amp electricity service.<\/p>\n<p>Phase Four development partners include Harvey-Cleary as general contractor and Pritchard Associates for construction management oversight. Project leadership is handled by Case Van Lare, managing director with Provident, and Chris Martin, director of Southwest industrial development and acquisitions.<\/p>\n<p>\u201cThe continued growth of Gateway Logistics Park underscores our commitment to delivering high-quality industrial space in El Paso,\u201d Martin said. \u201cWith the success of the earlier phases, this next phase strengthens the park\u2019s position as a critical hub for logistics and distribution for the region.\u201d<\/p>\n<p>According to the latest <a href=\"https:\/\/www.commercialcafe.com\/blog\/national-industrial-report\/\" target=\"_blank\" rel=\"noopener\">national industrial real estate report<\/a>, two Texas markets \u2014 Houston and Dallas-Fort Worth \u2014 ranked among the top 30 in the final quarter of 2024. Q4 deliveries in Houston totaled more than 1.2 million square feet of new industrial space, and developers had roughly 12.9 million more square feet under construction at the start of 2025.<\/p>\n<p>At the same time, the Dallas-Fort Worth metroplex pipeline at the start of the year exceeded 19 million square feet, following a market expansion of roughly 2,644,000 square feet delivered during Q4.<\/p>\n<p><em>Interested in renting warehouse or industrial space in key Texas markets or other well-connected locations? Visit the <\/em><a href=\"http:\/\/www.commercialcafe.com\" target=\"_blank\" rel=\"noopener\"><em>CommercialCafe.com<\/em><\/a><em> homepage to begin your listings search!<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gateway Logistics Park is well positioned for tenant operating in cross-border logistics and distribution and phase four will deliver nearly 500,000 square feet of new class A industrial space to the El Paso, Texas, market. <\/p>\n","protected":false},"author":48,"featured_media":41811,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[37,41],"tags":[],"class_list":["post-41810","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commercial-real-estate-news","category-industrial","wpautop"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.4 (Yoast SEO v24.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Provident Begins Phase 4 of Logistics Park | CommercialCafe<\/title>\n<meta name=\"description\" content=\"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Provident Begins Construction of Phase 4 at El Paso Industrial Park\" \/>\n<meta property=\"og:description\" content=\"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/\" \/>\n<meta property=\"og:site_name\" content=\"CommercialCafe\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-03T04:13:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-25T11:40:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1980\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ioana Ginsac\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ioana Ginsac\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/\",\"url\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/\",\"name\":\"Provident Begins Phase 4 of Logistics Park | CommercialCafe\",\"isPartOf\":{\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg\",\"datePublished\":\"2025-03-03T04:13:43+00:00\",\"dateModified\":\"2025-03-25T11:40:12+00:00\",\"author\":{\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/48aeaad10a9efc4d927324fcb20632f2\"},\"description\":\"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage\",\"url\":\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg\",\"contentUrl\":\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg\",\"width\":1980,\"height\":1280,\"caption\":\"panoramic view of el paso texas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.commercialcafe.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Provident Begins Construction of Phase 4 at El Paso Industrial Park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/#website\",\"url\":\"https:\/\/www.commercialcafe.com\/blog\/\",\"name\":\"CommercialCafe\",\"description\":\"Your Commercial Real Estate Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.commercialcafe.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/48aeaad10a9efc4d927324fcb20632f2\",\"name\":\"Ioana Ginsac\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/04\/Ioana-Ginsac.png?w=96\",\"contentUrl\":\"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/04\/Ioana-Ginsac.png?w=96\",\"caption\":\"Ioana Ginsac\"},\"description\":\"Ioana is a content writer who has been covering all-things-CRE (and more) for several Yardi network publications since 2017. You will find her byline regularly in industry news and market reports, but also on articles covering sustainable development, green urbanism, and innovation, all of which she has been passionately learning about for more than a decade. Her work has been referenced by publications including AmericanInno, Bisnow, BusinessInsider, Commercial Property Executive, Curbed, Fast Company, Forbes, GlobeSt.\",\"jobTitle\":\"Senior Content Writer, Industry News & Reports\",\"url\":\"https:\/\/www.commercialcafe.com\/blog\/author\/ioana-ginsac\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Provident Begins Phase 4 of Logistics Park | CommercialCafe","description":"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/","og_locale":"en_US","og_type":"article","og_title":"Provident Begins Construction of Phase 4 at El Paso Industrial Park","og_description":"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.","og_url":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/","og_site_name":"CommercialCafe","article_published_time":"2025-03-03T04:13:43+00:00","article_modified_time":"2025-03-25T11:40:12+00:00","og_image":[{"width":1980,"height":1280,"url":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg","type":"image\/jpeg"}],"author":"Ioana Ginsac","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ioana Ginsac","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/","url":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/","name":"Provident Begins Phase 4 of Logistics Park | CommercialCafe","isPartOf":{"@id":"https:\/\/www.commercialcafe.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage"},"image":{"@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage"},"thumbnailUrl":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg","datePublished":"2025-03-03T04:13:43+00:00","dateModified":"2025-03-25T11:40:12+00:00","author":{"@id":"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/48aeaad10a9efc4d927324fcb20632f2"},"description":"Provident Industrial begins construction of nearly 500,000 square feet of class A industrial space in El Paso at Gateway Logistics Park.","breadcrumb":{"@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#primaryimage","url":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg","contentUrl":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg","width":1980,"height":1280,"caption":"panoramic view of el paso texas"},{"@type":"BreadcrumbList","@id":"https:\/\/www.commercialcafe.com\/blog\/provident-begins-construction-of-phase-4-at-el-paso-industrial-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.commercialcafe.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Provident Begins Construction of Phase 4 at El Paso Industrial Park"}]},{"@type":"WebSite","@id":"https:\/\/www.commercialcafe.com\/blog\/#website","url":"https:\/\/www.commercialcafe.com\/blog\/","name":"CommercialCafe","description":"Your Commercial Real Estate Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.commercialcafe.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/48aeaad10a9efc4d927324fcb20632f2","name":"Ioana Ginsac","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.commercialcafe.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/04\/Ioana-Ginsac.png?w=96","contentUrl":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2026\/04\/Ioana-Ginsac.png?w=96","caption":"Ioana Ginsac"},"description":"Ioana is a content writer who has been covering all-things-CRE (and more) for several Yardi network publications since 2017. You will find her byline regularly in industry news and market reports, but also on articles covering sustainable development, green urbanism, and innovation, all of which she has been passionately learning about for more than a decade. Her work has been referenced by publications including AmericanInno, Bisnow, BusinessInsider, Commercial Property Executive, Curbed, Fast Company, Forbes, GlobeSt.","jobTitle":"Senior Content Writer, Industry News & Reports","url":"https:\/\/www.commercialcafe.com\/blog\/author\/ioana-ginsac\/"}]}},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/www.commercialcafe.com\/blog\/wp-content\/uploads\/sites\/10\/2025\/02\/el-paso-texas.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/posts\/41810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/users\/48"}],"replies":[{"embeddable":true,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/comments?post=41810"}],"version-history":[{"count":1,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/posts\/41810\/revisions"}],"predecessor-version":[{"id":41812,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/posts\/41810\/revisions\/41812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/media\/41811"}],"wp:attachment":[{"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/media?parent=41810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/categories?post=41810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.commercialcafe.com\/blog\/wp-json\/wp\/v2\/tags?post=41810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}