- For Lease Contact for pricing
- Property Type Industrial - Manufacturing
- Property Size 400,000 SF
- Lot Size 5.94 Acre
- Date Updated Oct 19, 2026
- HVAC None
Description
Highlights
- 1 Hour Drive Time to the Gordie Howe International Bridge and the Canadian market
- 2025 Construction Approval
- Access to Detroit and Toledo
- Detroit Metropolitan Airport 22 miles from the site
- Due Diligence complete
- Mass grading and utility plans ready for permit
- Minimal drive time to Interstate 80/90, Interstate 475, and beyond
- Northbound/Southbound access to I-75 at Exit 11/Laplaisance Rd. New highway interchange built in 2023
- Port of Monroe with access to the Great Lakes, Canada, and beyond
- Rail: Norfolk Southern Railway, Canadian National Railway, and CSX Transportation
- Two 10,600-foot runways at the Toledo Express Airport (38 miles) able to accommodate Boeing 747 and Airbus A380
- Utilities on-site with excess capacity
True
1 Space Available
Monroe Commerce Center Lot 2 - 400,000 SF
Manufacturing
Contact for pricing
400,000 SF
400,000 - 400,000 SF
Immediate
NNN
Yes
No
InSite Real Estate presents Monroe Commerce Center Lot 2, a shovel ready build-to-suit site located in Monroe, MI (Detroit MSA). This site is permitted for industrial use and can accommodate an up to 400,000 SF requirement. The Monroe Commerce Center is located at Exit 11 on I-75 with minimal drive time to Interstate 80/90, Interstate 475, and beyond. Due diligence has been completed with multiple state, regional, and local incentives available. Conveniently located within a 1-hour drive of the Gordie Howe International Bridge and the Canadian market, this location is also 22 miles from the Detroit Metropolitan Airport with rail service provided by Norfolk Southern Railway, Canadian National Railway, and CSX Transportation.
Contacts
InSite Real Estate
Location
InSite Real Estate