- For Sale Contact for pricing
- Property Type VacantLand
- Property Size 760,993.2 SF
- Lot Size 17.47 Acre
- Date Updated Feb 26, 2026
Description
17.47 acre site ideally set up for the development of an energy storage facility.
New Mexico has a statewide goal of 100% carbon-free electricity by 2045. New Mexico's Public Utility Act has been updated to include energy storage development. The state has set goals to develop 2,000MW/7,000MWh of energy storage capacity by 2034, with 1,000MW/3,500MWh of energy storage capacity online by the end of 2028.
The Federal Infrastructure and Jobs Act authorizes $1.2 trillion for transportation and infrastructure spending with $500 billion going toward new investments and programs, including battery storage.
Ideal site for energy storage facility, adjacent to PNM Volcano Power Substation
Power lines from substation are 115 KV electric bulk power transmission and control lines
Access to the site via Airport Dr. with potential from additional access along Coors Blvd.
Water and sewer located in Airport Dr.
False
Contacts
CBRE
CBRE