Spartan Exchange Phase II Build-to-Suit Site

New Hope Drive Spartanburg, Spartanburg, SC 29301

Property Information

  • For Sale Contact for pricing
  • Property Type Industrial - Warehouse/Distribution
  • Building Class A
  • Date Updated Jun 6, 2026

Description

The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.

Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.

At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.

Please contact the industrial brokerage team in Spartanburg for more information about this property.

Proposed

Contacts

Garrett Scott

Colliers

John Montgomery

Colliers

Brockton Hall

Colliers

Dillon Swayngim

Colliers

Location

Located at New Hope Drive Spartanburg, Spartanburg, SC 29301, this property is part of the Wellford neighborhood and Greenville market.

Contact Spartan Exchange Phase II Build-to-Suit Site
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.