- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Property Size 569,400 SF
- Lot Size 45.3 Acre
- Parking Spaces Avail. 279
- Parking Ratio 0.49 / 1,000 SF
- Property Tenancy Vacant
- Building Class A
- Year Built 2024
- Date Updated May 13, 2026
Description
The Lake County Logistics Center - Building 100 is a 569,400-square-foot warehouse/distribution facility located on a 45.3-acre lot. Constructed in 2024, this Class A building is designed for modern industrial needs and features 279 parking spaces with a parking ratio of 0.49. The property offers spacious accommodations for large-scale operations and is well-suited for businesses seeking high-quality space in a newly built structure.
Situated in Groveland, FL, the property benefits from several points of interest within driving distance. Nearby parking facilities include the Minneola Park & Ride Lot approximately 5.7 miles away, along with other options ranging from 6 to 8.5 miles. Fuel stations such as Sunoco, BP, Citgo, and RaceTrac are all situated between 5.5 and 6.3 miles from the property, offering convenience for transportation needs.
True
1 Space Available
Full Building
Warehouse/Distribution
Contact for pricing
569,400 SF
569,400 - 569,400 SF
281
Immediate
Yes
No
3,200 Amps at 480 Volts 3-Phase - Two 1,600 amps panels
36'
56' x 54'
123
4
2,892 SF
Tilt-wall
3,200 Amps at 480 Volts 3-Phase
ESFR
Contacts
Jones Lang LaSalle
Jones Lang LaSalle