- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Date Updated May 15, 2026
Description
OMP Gateway 11 - Positioned for the next wave of industrial development in the Henderson Submarket, OMP Gateway 11 provides excellent connectivity to I-11 via Railroad Pass Casino Drive. This project is ±20 miles to
the Harry Reid International Airport, ±19 miles to the Las Vegas Strip and less than ±45 miles to the California border. Estimated delivery Q1 2024.
- Building 1 is ±646,380 SF, with a 40’ clear height, 116 – 9’ x 10’ dock high loading doors, 4 – 14’ x 16’ grade level loading doors, 230 auto parking stalls, 274 trailer stalls and Industrial Zoning.
- Building 2 is ±1,102,440 SF with a 40’ clear height, 184 – 9’ x 10’ dock high loading doors, 4 – 14’ x 16’ grade level loading doors, 828 auto parking stalls, 310 trailer stalls and Industrial Zoning.
Highlights
- Dock High Loading
- Grade Level Loading
- Henderson Submarket
- IG Zoning
True
1 Space Available
Space Available
Warehouse/Distribution
Contact for pricing
1,748,720 SF
646,380 - 1,748,720 SF
Immediate
Yes
No
Full build out
Contacts
Colliers
Colliers
Colliers
Colliers