- For Sale Contact for pricing
- Property Type VacantLand
- Property Size 284,882.4 SF
- Lot Size 6.54 Acre
- Date Updated Aug 24, 2026
Description
±6.54 acres fronting the Oakland-Murphy Beltline Connector trail. The trail is scheduled to start construction in early 2027 and this path will connect the main Southside Beltline to the Oakland City MARTA Station. This is a quickly evolving submarket combined with easy access to the connector, the airport, and downtown. The Lee and White mixed-use development is half a mile away and the new hospital planned by Atrium is only a mile away. The site was recently rezoned to MRC-3/BL, Mixed Residential Commercial/Beltline Overlay. This is a “high-density mixed-use designation made to promote active, walkable, and dense neighborhoods for residential and commercial spaces to co-exist under the same development block”.
False