- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Building Class A
- Date Updated Jun 6, 2026
Description
The second phase of proposed industrial development at Spartan Exchange is now available for build-to-suit offers. This ±65-acre site is situated behind the fully leased Spartan Exchange Phase I building on Tyger Lake Rd.
Master plans show potential for multiple development scenarios and up to two buildings at this location: Proposed Building A (247,000 SF) and Proposed Building B (310,960 SF).
The developer, SunCap, proposes Class A concrete tilt-wall facilities with rear-load orientation.
Industrial users at this location are able to take advantage of extremely close proximity to I-85 (less than one half mile), with all-right turns leading straight to both the northbound and southbound on-ramps at Exit 66.Norfolk Southern Rail line borders this property to the north, with potential for direct access terminal. Nearby corporate neighbors include Leigh Fibers, XPO Logistics, Gibbs International, Firestone, Pacorini, Adidas and FedEx Freight.
At approximately 10 miles to BMW Plant Spartanburg, this property meets BMW's "just-in-time, just'in-sequence" requirement and is also ±10 miles from the logistics hub surrounding the Inland Port in Greer, SC. All utilities are available on-site with minimal impediments to development.
Please contact the industrial brokerage team in Spartanburg for more information about this property.
Proposed
Highlights
- ±10 miles to SC Inland Port
- ±3 miles to I-26
- 2 Proposed Buildings
- Access via New Hope Rd (all right turns to I-85)
- All utilities on-site
- Meets "just-in-time, just-in-sequence" requirements for BMW
- Norfolk Southern rail access to the north
True
1 Space Available
Space Available
Warehouse/Distribution
Contact for pricing
310,960 SF
247,000 - 310,960 SF
Immediate
Yes
No
Full build out
None
Contacts
Colliers
Colliers
Colliers
Colliers