- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Property Size 567,893 SF
- Lot Size 30.86 Acre
- Parking Spaces Avail. 380
- Parking Ratio 0.67 / 1,000 SF
- Property Tenancy Vacant
- Building Class A
- Year Built 2023
- Date Updated Sep 1, 2026
Description
Metro Air Park - Building 8 is a 567,893-square-foot warehouse/distribution facility built in 2023. Situated on a 30.86-acre lot, this Class A building offers modern infrastructure and ample parking, with 380 spaces and a parking ratio of 0.67. Its cutting-edge design and substantial size make it a prime choice for industrial tenants seeking contemporary spaces tailored for large-scale operations.
Located at 7320 Power Line Road in Sacramento, this property is approximately 1 mile from Concourse B and Central Terminal B, offering convenient access to airport facilities. Nearby parking options include Employee Parking and Daily Parking, both within a mile of the site, as well as Hourly Parking slightly further at 1.26 miles. Fuel stations such as Arco and SMUD are also within a 2-mile radius, adding practicality for logistics and fleet management.
True
1 Space Available
Space Available
Warehouse/Distribution
Contact for pricing
87,915 SF
87,915 - 87,915 SF
384
Immediate
Yes
No
No
Spec Office Area: ±2,884 SF Includes Open Area, 1 Office, Break Room, 11 Work Stations, 3 Restrooms (See brochure for details & floorplan) Dock Doors: 13 – 9' x 10' Grade Level Doors: 1 – 12' x 14' Clear Height: 36' Column Spacing: 56' x 60' Fire Suppression: ESFR Electrical: 277/480 Volt Skylights: 1 Per 2,000 SF Building Depth: 517' Construction: 7? Concrete Slab Roof: Metal w/ R-13 Insulation Auto Parking: 66 Stalls Trailer Parking: 22 Stalls Parcel Size: 31.7 Acres Coverage: 38.5% Go to Nearby Listings: Metro Air Park
36'
56' x 60'
1
2,884 SF
277/480 Volt
ESFR
Contacts
The Buzz Oates Group of Companies