- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Property Size 567,893 SF
- Lot Size 30.86 Acre
- Parking Spaces Avail. 380
- Parking Ratio 0.67 / 1,000 SF
- Property Tenancy Vacant
- Building Class A
- Year Built 2023
- Date Updated Apr 16, 2026
Description
Metro Air Park - Building 8 is a 567,893-square-foot warehouse/distribution facility built in 2023. Situated on a 30.86-acre lot, this Class A building offers modern infrastructure and ample parking, with 380 spaces and a parking ratio of 0.67. Its cutting-edge design and substantial size make it a prime choice for industrial tenants seeking contemporary spaces tailored for large-scale operations.
Located at 7320 Power Line Road in Sacramento, this property is approximately 1 mile from Concourse B and Central Terminal B, offering convenient access to airport facilities. Nearby parking options include Employee Parking and Daily Parking, both within a mile of the site, as well as Hourly Parking slightly further at 1.26 miles. Fuel stations such as Arco and SMUD are also within a 2-mile radius, adding practicality for logistics and fleet management.
True
1 Space Available
Space Available
Warehouse/Distribution
Contact for pricing
87,915 SF
87,915 - 87,915 SF
384
Immediate
Yes
No
Industrial warehouse available at 7320 Power Line Road in Sacramento, CA, situated within the Metro Air Park Master Planned Industrial Development. Includes an ESFR fire sprinkler system, and ample parking. Conveniently located at the intersection of Power Line Road and Serna Drive, it provides easy access to Interstate 5 and Highway 99 in the Natomas & Northgate industrial submarket.
ESFR
Contacts
CBRE
CBRE
CBRE
The Buzz Oates Group of Companies