- For Lease Contact for pricing
- Property Type Industrial - Warehouse/Distribution
- Parking Spaces Avail. 541
- Building Class B
- Year Built 2001
- Date Updated Sep 7, 2026
Description
The state-of-the-art facility features a 120,000-square-foot first floor, 40,000-square-foot second floor, 4,000 amps of power, 25-foot clear heights, 16 loading docks, and 100% climate-controlled space with HVAC throughout. A dedicated truck court and separate employee parking circulation support efficient operations, while 541 parking spaces, including EV parking, provide exceptional employee accommodation.
Strategically located within Cherry Hill Park, the property offers outstanding regional connectivity with access to Route 128 in just 3 minutes, Interstate 95 in 8 minutes, Route 1 in 10 minutes, and Boston in approximately 30 minutes. The location is surrounded by a concentration of leading advanced manufacturing, medical technology, biotechnology, and precision engineering companies, positioning tenants within one of Massachusetts' most established innovation and industrial clusters.
Scheduled for delivery in late 2027/early 2028, 75 Sam Fonzo Drive combines institutional-quality construction, significant power infrastructure, flexible floor plates, and premier access to Greater Boston's workforce, making it an ideal solution for advanced manufacturing, R&D, technology, medical device production, assembly, life science support, and industrial users seeking a next-generation facility on Boston's North Shore.
Highlights
- 25’ clear height; 14’ under 2nd Floor
- Flexible Subdivisions
- Heavy Power
- Subdividable to 40,000 SF
True
1 Space Available
Space Available
Warehouse/Distribution
Contact for pricing
160,000 SF
160,000 - 160,000 SF
Immediate
Yes
No
40' x 40'